Home
About Us
Products
Element Holding Brick / Groove Bricks
Strip Holding Brick
Muffle Sets
Burner Block
Alumina Refractory Tubes and Pipes
Acid Proof Pipes / Sleeves
Ceramic Ferrules
Ceramic Washers
Pouring Cups
Core-Breakers
Coating / Stucco Sand
Fire Bricks and Insulation Bricks
Ceramics Fibre Boards and Rolls
Castable and Mortars
Precast Blocks
Gallery
Contact Us
Magnetek SBP2-8-WBS Pendant 8-Button w/ On/Off + Attached Cable Harting Pg21
USD 647.00 USD
SKU:
CqMKzQBh
Brand:
Magnetek
MPN:
SBP2-8-WH
Condition:
New – Open box
Tags:
Magnetek
Magnetek SBP2
PUSHBUTTON
SBP2-8-WH
Categories:
Heavy Equipment, Parts & Attachments
Specifications
Brand
Magnetek
Model
Magnetek SBP2
MPN
SBP2-8-WH
I appreciate that it is UV resistant and waterproof, so I can clean it with a hose.
Related Items
Oslo Controls SGDG Push Button Red
Magnetek SBP2-H2 Cherry Switch 0A6212A0
Magnetek F-359XP Power Transformer F359XP
Allen Bradley 800T-KD Pushbutton 800TKD Black 800T-KD2
ALLEN BRADLEY 800T-D1D1 PUSHBUTTON MUSHROOM GREEN 1NO SERIES T
ALLEN BRADLEY 800FM-LE6 EXTENDED PUSHBUTTON OPERATOR ILLUMINATED BLUE
SIEMENS 52RA5P2 PUSHBUTTON LENS RED (LOT OF 2) NNB
Magnetek Triad N-66A Isolation Transformer 230/115 Primary Volts #117E88PR6*CO